AGENCY04
Overall Review Rating
4.4 (6 Ratings)
Services
- Crypto Exchange Development
- E-commerce Development
- Market Research
- Advertising, Media
- Branding
- iOS App Development
- Cross Platform Development
- PhoneGap App Development
- Mobile App Development
- Android App Development
- Web Development
- Hybrid App Development
Industries Served
AGENCY04 Reviews
Have a look at these client reviews on previously delivered projects.
Abdullah Al-Shehri
Head of Innovation - Desert Tech VenturesMixed reality experience that impressed the client audience we were trying to win
The knowledge transfer at the end of the project was notably good. Too many vendors see handover as a tick-box exercise. This team ran structured sessions, produced documentation our internal team actually references, and spent real time making sure we understood the architecture decisions well enough to maintain and extend the system independently. Six months later we are doing exactly that without needing to go back to them for every question.
Project summary
A new commercial property division required tooling that was fundamentally different from our residential platform. Extending the existing system was not viable.
Nathan Prescott
VP of Technology - Ironclad Insurance GroupTechnically strong, commercially fair, and genuinely good to work with
We received proposals from six vendors. Four of them quoted us prices that bore no relationship to the actual scope. This team came back with something realistic and then delivered against it exactly. I have worked on enough technology projects to know that the gap between what is proposed and what is delivered is where trust gets destroyed. There was no gap here. What was promised is what we got, and the ongoing relationship we have built from this is something we intend to continue.
Project summary
Our field service management system was six years old and every limitation had been exposed by the growth in our technician headcount and job complexity.
Zofia Kamińska
CTO - Odra Tech StudioEnd-to-end testing that our development team now considers a productivity asset
I have been through several technology implementations in my career. The pattern I am used to is: detailed proposal, optimistic timeline, scope creep, overrun, excuses at the end. This engagement broke that pattern at every stage. The timeline was realistic from the start. Changes were managed through process. The final delivery matched what was agreed. Simple, but uncommon.
Project summary
Years of incremental development had left us with a platform that was functional but limiting. A structured rebuild was the agreed path forward.
Vikram Srinivasan
Head of Platform - Cascade EdTech SolutionsOutperformed our in-house team on every SLA we tracked from month one
The part of this project I had been most worried about was the integration work. Our system landscape is complex, some of the upstream APIs were barely documented, and one of our third-party vendors was notoriously slow to respond. This team documented what the upstream vendors could not, built resilience into the architecture where third-party reliability was uncertain, and delivered integrations that have worked exactly as specified since day one. I genuinely could not have asked for more.
Project summary
Grid modernisation funding required us to demonstrate demand-response capability. The ML models existed on paper — we needed an engineering partner to build and deploy them.
Dominic Fairfax
Head of Digital Transformation - Arcadian Consulting LtdE-commerce rebuild that generated positive ROI before the end of its first quarter live
We handed them an aggressive deadline, a complex scope, and a client-side team that was stretched and not always available when they needed us. They handled that gracefully. They were precise about what they needed and when they needed it. Where they could proceed independently they did. The delivery landed on time in spite of the constraints we added. I regard that as strong evidence of genuine professional maturity — not just capability.
Project summary
Seven years of incremental changes had left our trading platform fragile. Latency was worsening, technical debt was growing, and the rebuild conversation had been postponed long enough.