Baker Security & Networks
Overall Review Rating
4.4 (6 Ratings)
Services
- Internet Marketing
- Web Development
- .NET Development
- Azure Services
- iOS App Development
- Mobile App Development
- AngularJS Development
- Android App Development
- Game Development
- Cross Platform Development
- Branding
- Hyperledger
Industries Served
Baker Security & Networks Reviews
Have a look at these client reviews on previously delivered projects.
Ji-Woo Park
VP of Engineering - Seoul Digital CorpPost-release incident rate halved in the first quarter after they joined
Looking back, what strikes me most is how little drama there was. Real technology projects have problems. This one had them too — but every problem was flagged before it became a crisis, every scope change was handled through a proper process, and every risk was managed rather than buried. Our project manager said it was the smoothest vendor engagement he had been involved in. Given how complex the technical requirements were, I think that reflects genuine delivery maturity.
Project summary
Matter administration time had grown to the point where it was showing up in utilisation metrics. Every hour spent on systems was an hour not billed — the business case did not need modelling.
Khalid Al-Mansoori
Director of Innovation - Emaar Digital GroupThe outcome we needed, on the timeline we needed it, by people we would use again
Looking back, what strikes me most is how little drama there was. Real technology projects have problems. This one had them too — but every problem was flagged before it became a crisis, every scope change was handled through a proper process, and every risk was managed rather than buried. Our project manager said it was the smoothest vendor engagement he had been involved in. Given how complex the technical requirements were, I think that reflects genuine delivery maturity.
Project summary
Grid modernisation funding required us to demonstrate demand-response capability. The ML models existed on paper — we needed an engineering partner to build and deploy them.
Rupert Ashford
Director of eCommerce - Hargrove Retail PLCCheckout completion rate improved from day one of production. Not week three — day one.
What set this team apart in practice was their engineering judgment — specifically, their willingness to tell us when our requirements were wrong and explain what to do instead. Not every vendor does that. The consultative element elevated the final output well beyond what our original brief described. We ended up with something better than what we had asked for, which is not a sentence I expected to be writing in a review.
Project summary
Seven years of incremental changes had left our trading platform fragile. Latency was worsening, technical debt was growing, and the rebuild conversation had been postponed long enough.
Abdullah Al-Shehri
Head of Innovation - Desert Tech VenturesGameplay feel matched the design intent exactly. Harder than it sounds.
Three months post-launch our key metrics are all moving in the right direction — user adoption ahead of target, support volume down, time-on-task reduced for our core workflows. The product team has started planning features that were never viable on the previous platform. That is the real proof of the investment: it opened up possibilities rather than just replacing what was there before.
Project summary
Our internal team was committed to maintenance and could not absorb a new build of this complexity. An external partner was the only way to hit the timeline.
Flynn Buchanan
GM of Technology - Pacific Rim Commerce GroupHeadless CMS that let designers and developers finally work in parallel
The technical quality is the obvious thing to highlight. The automated test suite is comprehensive, the deployment pipeline is solid, and the documentation is actually useful rather than written to satisfy a checklist. But the metric I keep coming back to is what has NOT happened since go-live. No 2am incident calls. No emergency patches. No post-launch retrospectives about what went wrong. For a system of this complexity, that outcome is exactly what we paid for.
Project summary
Our internal team was committed to maintenance and could not absorb a new build of this complexity. An external partner was the only way to hit the timeline.