topappdevelopmentcompanies
Write a Review menu
Menu

Overall Review Rating

4.5 (5 Ratings)

Quality 4.6/5
Schedule 4.7/5
Cost 4.6/5
Communication 4.4/5

Services

  • Blockchain Development
  • Mobile App Development
  • CRM Development
  • Web Development
  • Cross Platform Development
  • Cloud Security Services
  • Chat Bots & AI Development
  • Android App Development
  • Drupal
  • Business Analysis & Consulting
  • iOS App Development
  • Ethereum Blockchain

Industries Served

Education Food & Beverage Insurance Logistics & Supply Chain Nonprofit & NGO

Cicada Technologies Reviews

Have a look at these client reviews on previously delivered projects.

Imogen Tanner

Head of Engineering - Outback Data Solutions
Posted on Sep 22, 2024
4.5 Overall Rating

Performance testing caught a latency issue three weeks before our biggest traffic event

What set this team apart in practice was their engineering judgment — specifically, their willingness to tell us when our requirements were wrong and explain what to do instead. Not every vendor does that. The consultative element elevated the final output well beyond what our original brief described. We ended up with something better than what we had asked for, which is not a sentence I expected to be writing in a review.

Project summary

Route optimisation was being handled in spreadsheets. The operational cost of that was measurable and the fix was obvious — but it required engineering investment we had been deferring.

Quality 5.0/5
Schedule 4.5/5
Cost 4.5/5
Communication 4.5/5
project type
Project Type Quality Assurance & Testing
industry
Industry Logistics & Supply Chain
project cost
Project Cost $10,000 to $49,999
Read Full Review

Melissa Ortega

VP of Product - Brightline EdTech Inc
Posted on Sep 10, 2024
4.5 Overall Rating

Attribution answers we had stopped asking for — now we get them daily

The platform has been live for six months and is handling three times the transaction volume we scoped for. That is not because we underestimated — it is because the architecture choices made during discovery were genuinely forward-thinking. Most vendors design for exactly what you tell them. This team designed for what you are likely to need. We are already scoping the next phase and there was no question about who we would use.

Project summary

Years of incremental development had left us with a platform that was functional but limiting. A structured rebuild was the agreed path forward.

Quality 4.5/5
Schedule 4.5/5
Cost 4.5/5
Communication 4.0/5
project type
Project Type Digital Marketing
industry
Industry Food & Beverage
project cost
Project Cost $500,000+
Read Full Review

Thabo Ndlovu

Head of Technology - Highveld Tech Pty Ltd
Posted on Mar 19, 2024
4.5 Overall Rating

Immersive build that landed exactly where the brief pointed — and then kept going

Honestly, I came into this engagement with some scepticism. We had a bad experience with a vendor twelve months earlier and I wanted to see evidence of competence, not just hear about it. The discovery documentation was the first signal. The sprint delivery consistency was the second. By go-live I had stopped being sceptical and started planning how to expand the engagement. The production system has been stable from day one and our internal team loves working with the codebase they left us.

Project summary

Our product thinking was strong. Our execution capacity in this specific domain was limited. We needed deep expertise, not a generalist willing to learn on our time.

Quality 4.5/5
Schedule 4.5/5
Cost 5.0/5
Communication 5.0/5
project type
Project Type AR/VR Development
industry
Industry Nonprofit & NGO
project cost
Project Cost $500,000+
Read Full Review

Adriana Voss

Director of Platform Engineering - Cascadia Digital Ventures
Posted on Nov 05, 2023
4.5 Overall Rating

Legacy-to-cloud-native in a timeline our previous vendor said was impossible

Our stakeholder group was unusually broad — board sponsors, operational users, compliance leads, and an IT team with strong opinions. I have watched vendors handle that kind of environment badly. This team adjusted how they communicated depending on who they were talking to, managed expectations honestly when things shifted, and delivered something that each group considers a success. Getting everyone to agree on that outcome was not straightforward and they deserve credit for making it happen.

Project summary

Broker portal satisfaction scores had fallen for two consecutive years. Specific feedback pointed to the same workflow frustrations. We needed a redesign, not a patch.

Quality 4.5/5
Schedule 5.0/5
Cost 4.5/5
Communication 4.5/5
project type
Project Type Cloud Services
industry
Industry Insurance
project cost
Project Cost $500,000+
Read Full Review

Reuben Loh

CTO - Marina Bay Ventures Pte Ltd
Posted on Oct 21, 2023
4.5 Overall Rating

A vendor that earned a place on our preferred supplier list through delivery, not sales

Three months post-launch our key metrics are all moving in the right direction — user adoption ahead of target, support volume down, time-on-task reduced for our core workflows. The product team has started planning features that were never viable on the previous platform. That is the real proof of the investment: it opened up possibilities rather than just replacing what was there before.

Project summary

Our content delivery infrastructure worked at current scale but showed clear signs it would not survive the enrolment growth our strategic plan assumed.

Quality 4.5/5
Schedule 5.0/5
Cost 4.5/5
Communication 4.0/5
project type
Project Type Embedded Systems Development
industry
Industry Education
project cost
Project Cost Less than $10,000
Read Full Review
back to top