Frontjet
Overall Review Rating
4.4 (5 Ratings)
Services
- Web Development
- Cross Platform Development
- E-Commerce
- Custom Application Development
- App Marketing
- DevOps
- Digital Strategy Management
- AWS Services
- Automotive R&D
- Mobile App Development
- Android App Development
- iOS App Development
Industries Served
Frontjet Reviews
Have a look at these client reviews on previously delivered projects.
Takashi Morimoto
Director of IT Strategy - Sakura Digital KKHandled twelve times normal load on peak day without a single incident
What set this team apart in practice was their engineering judgment — specifically, their willingness to tell us when our requirements were wrong and explain what to do instead. Not every vendor does that. The consultative element elevated the final output well beyond what our original brief described. We ended up with something better than what we had asked for, which is not a sentence I expected to be writing in a review.
Project summary
A failed engagement the previous year had made us more rigorous about vendor selection. We took the time to find a partner we actually trusted before we committed.
Shreya Krishnaswamy
VP of Product - Luminar Tech Pvt LtdThe kind of game studio that treats production quality as non-negotiable
The knowledge transfer at the end of the project was notably good. Too many vendors see handover as a tick-box exercise. This team ran structured sessions, produced documentation our internal team actually references, and spent real time making sure we understood the architecture decisions well enough to maintain and extend the system independently. Six months later we are doing exactly that without needing to go back to them for every question.
Project summary
The EV transition had created dealer network management requirements our existing DMS was not designed for. A targeted rebuild was the only path forward that timeline would allow.
Elliot Thorne
Managing Director, Technology - Redwood Capital AdvisorsUsers come back daily. The engagement data confirmed what we hoped for.
Looking back, what strikes me most is how little drama there was. Real technology projects have problems. This one had them too — but every problem was flagged before it became a crisis, every scope change was handled through a proper process, and every risk was managed rather than buried. Our project manager said it was the smoothest vendor engagement he had been involved in. Given how complex the technical requirements were, I think that reflects genuine delivery maturity.
Project summary
A content licensing deal gave us rights we did not have the infrastructure to monetise. We needed a streaming platform that could scale before the deal window opened.
Sebastian Lapointe
CTO - Boreal Systems IncEvery milestone hit. Every commitment met. No excuses, just delivery.
We handed them an aggressive deadline, a complex scope, and a client-side team that was stretched and not always available when they needed us. They handled that gracefully. They were precise about what they needed and when they needed it. Where they could proceed independently they did. The delivery landed on time in spite of the constraints we added. I regard that as strong evidence of genuine professional maturity — not just capability.
Project summary
A new care pathway required patient data to move between systems in a way our current architecture did not support. The integration complexity was beyond what we could handle in-house.
Priya Chandrasekaran
VP of Data & AI - Wavefront Analytics IncFirmware, cloud layer, and dashboard — all three actually talk to each other. Novel.
I have been through several technology implementations in my career. The pattern I am used to is: detailed proposal, optimistic timeline, scope creep, overrun, excuses at the end. This engagement broke that pattern at every stage. The timeline was realistic from the start. Changes were managed through process. The final delivery matched what was agreed. Simple, but uncommon.
Project summary
Time-to-market for new tariff products had become a competitive liability. Our product configuration layer was the bottleneck and it had been identified as the priority fix.