FullStack Labs
Overall Review Rating
4.3 (7 Ratings)
Overview
They design & develop websites, mobile apps, and custom software solutions that are as elegant as they are useful. They practice in combining enterprise technologies to increase efficiencies, decrease wasted time & effort, and improve clarity into the data and metrics that matter most. They know economic constraints, so they keep the project on budget & meet the deadlines.
Services
- Web Development
- Magento
- Mobile App Design
- iOS App Development
- Drupal
- Cross Platform Development
- Android App Development
- Game Development
- Ruby on Rails
- ICO consulting Blockchain Implementation
- Internet Marketing
- Mobile App Development
Industries Served
FullStack Labs Reviews
Have a look at these client reviews on previously delivered projects.
Ji-Woo Park
VP of Engineering - Seoul Digital CorpPen test found things our previous vendor had missed for two consecutive years
Looking back, what strikes me most is how little drama there was. Real technology projects have problems. This one had them too — but every problem was flagged before it became a crisis, every scope change was handled through a proper process, and every risk was managed rather than buried. Our project manager said it was the smoothest vendor engagement he had been involved in. Given how complex the technical requirements were, I think that reflects genuine delivery maturity.
Project summary
The project had a board-level visibility date. We needed a partner who would treat the deadline as their own.
Zara Hussain
Head of Technology - Ravi Digital AgencyDelivered what the proposal described. More rare than it should be.
We went with a smaller team than we had originally planned for. I had concerns about whether the capacity would be sufficient given our timeline. Those concerns were unfounded. The team was focused, communication was constant, and the quality at each milestone review was consistent throughout. Smaller does not mean slower when the people are the right ones and this engagement proved that.
Project summary
Our product thinking was strong. Our execution capacity in this specific domain was limited. We needed deep expertise, not a generalist willing to learn on our time.
Sebastian Lapointe
CTO - Boreal Systems IncFirst QA engagement where the team found bugs before the client did. Consistently.
We went with a smaller team than we had originally planned for. I had concerns about whether the capacity would be sufficient given our timeline. Those concerns were unfounded. The team was focused, communication was constant, and the quality at each milestone review was consistent throughout. Smaller does not mean slower when the people are the right ones and this engagement proved that.
Project summary
Years of incremental development had left us with a platform that was functional but limiting. A structured rebuild was the agreed path forward.
Preet Sandhu
Senior Engineering Manager - Prairie Tech Solutions IncEvery milestone hit. Every commitment met. No excuses, just delivery.
What set this team apart in practice was their engineering judgment — specifically, their willingness to tell us when our requirements were wrong and explain what to do instead. Not every vendor does that. The consultative element elevated the final output well beyond what our original brief described. We ended up with something better than what we had asked for, which is not a sentence I expected to be writing in a review.
Project summary
Our mobile app sat at 2.9 stars. Every negative review mentioned the same two things — speed and checkout complexity. Both were fixable with the right engineering approach.
Hyun-Su Lim
Director of Platform - Hanam Tech SolutionsProactive monitoring prevented an issue that would have cost us a trading day
I have been through several technology implementations in my career. The pattern I am used to is: detailed proposal, optimistic timeline, scope creep, overrun, excuses at the end. This engagement broke that pattern at every stage. The timeline was realistic from the start. Changes were managed through process. The final delivery matched what was agreed. Simple, but uncommon.
Project summary
Our internal team was committed to maintenance and could not absorb a new build of this complexity. An external partner was the only way to hit the timeline.