Netlandish
Overall Review Rating
4.3 (6 Ratings)
Services
- Platform Development
- Web Development
- Private Blockchains
- E-commerce Development
- App Marketing
- iOS App Development
- AR App Development
- Cross Platform Development
- Android App Development
- Mobile App Development
- Logo Designing
- Cloud Provisioning Services
Industries Served
Netlandish Reviews
Have a look at these client reviews on previously delivered projects.
Takashi Morimoto
Director of IT Strategy - Sakura Digital KKTechnically strong, commercially fair, and genuinely good to work with
Honestly, I came into this engagement with some scepticism. We had a bad experience with a vendor twelve months earlier and I wanted to see evidence of competence, not just hear about it. The discovery documentation was the first signal. The sprint delivery consistency was the second. By go-live I had stopped being sceptical and started planning how to expand the engagement. The production system has been stable from day one and our internal team loves working with the codebase they left us.
Project summary
Open banking changes required us to rebuild our API layer properly — compliant by design, not patched together. We needed specialist engineers, not generalists.
Declan Hartley
Chief Digital Officer - Southern Cross TechnologyImplementation with the documentation and change management it deserved
What set this team apart in practice was their engineering judgment — specifically, their willingness to tell us when our requirements were wrong and explain what to do instead. Not every vendor does that. The consultative element elevated the final output well beyond what our original brief described. We ended up with something better than what we had asked for, which is not a sentence I expected to be writing in a review.
Project summary
Our previous vendor had left us with a codebase that worked but was nearly impossible to extend. We needed to fix that without stopping delivery to the business.
Omar Al-Farsi
Chief Technology Officer - Falcon Digital VenturesDelivered on scope, on budget, and with zero critical bugs at go-live
Looking back, what strikes me most is how little drama there was. Real technology projects have problems. This one had them too — but every problem was flagged before it became a crisis, every scope change was handled through a proper process, and every risk was managed rather than buried. Our project manager said it was the smoothest vendor engagement he had been involved in. Given how complex the technical requirements were, I think that reflects genuine delivery maturity.
Project summary
Our OEE reporting relied on manual data entry at the line level. We needed real-time, reliable data and our existing systems were not going to provide it without a significant rebuild.
Radosław Kowalczyk
Head of Development - Wisła Software Sp zooTechnically strong, commercially fair, and genuinely good to work with
Honestly, I came into this engagement with some scepticism. We had a bad experience with a vendor twelve months earlier and I wanted to see evidence of competence, not just hear about it. The discovery documentation was the first signal. The sprint delivery consistency was the second. By go-live I had stopped being sceptical and started planning how to expand the engagement. The production system has been stable from day one and our internal team loves working with the codebase they left us.
Project summary
Partner-level reporting required visibility into matter data that our current systems could not provide without significant manual extraction and aggregation.
Yuki Hashimoto
Head of Product Development - East Asia Commerce KKCI/CD pipeline that changed how our developers think about release risk
The technical quality is the obvious thing to highlight. The automated test suite is comprehensive, the deployment pipeline is solid, and the documentation is actually useful rather than written to satisfy a checklist. But the metric I keep coming back to is what has NOT happened since go-live. No 2am incident calls. No emergency patches. No post-launch retrospectives about what went wrong. For a system of this complexity, that outcome is exactly what we paid for.
Project summary
Our content delivery infrastructure worked at current scale but showed clear signs it would not survive the enrolment growth our strategic plan assumed.