Overall Review Rating
4.3 (5 Ratings)
Services
- Cross Platform Development
- IoT App Development
- Motion Graphics
- iOS App Development
- Business Analysis & Consulting
- Platform Development
- Web Development
- Cloud Security Services
- Big Data
- Mobile App Development
- Data Science & Big Data
- Android App Development
Industries Served
Sofyma Reviews
Have a look at these client reviews on previously delivered projects.
Julien Moreau
Co-Founder & CTO - TechLyon SASSoftware project that finished on time. Simple as that, and rarer than it should be.
What set this team apart in practice was their engineering judgment — specifically, their willingness to tell us when our requirements were wrong and explain what to do instead. Not every vendor does that. The consultative element elevated the final output well beyond what our original brief described. We ended up with something better than what we had asked for, which is not a sentence I expected to be writing in a review.
Project summary
A new care pathway required patient data to move between systems in a way our current architecture did not support. The integration complexity was beyond what we could handle in-house.
Théo Beaumont
VP of Innovation - Laurentian Tech PartnersAd spend efficiency improved 40% without reducing reach. The targeting work was the difference.
Looking back, what strikes me most is how little drama there was. Real technology projects have problems. This one had them too — but every problem was flagged before it became a crisis, every scope change was handled through a proper process, and every risk was managed rather than buried. Our project manager said it was the smoothest vendor engagement he had been involved in. Given how complex the technical requirements were, I think that reflects genuine delivery maturity.
Project summary
Smart meter rollout generated data volumes our analytics infrastructure could not handle. We needed a platform that scaled without requiring a rebuild every two years.
Elliot Thorne
Managing Director, Technology - Redwood Capital AdvisorsThe outcome we needed, on the timeline we needed it, by people we would use again
We went with a smaller team than we had originally planned for. I had concerns about whether the capacity would be sufficient given our timeline. Those concerns were unfounded. The team was focused, communication was constant, and the quality at each milestone review was consistent throughout. Smaller does not mean slower when the people are the right ones and this engagement proved that.
Project summary
Broker portal satisfaction scores had fallen for two consecutive years. Specific feedback pointed to the same workflow frustrations. We needed a redesign, not a patch.
Maja Söderström
Head of Product Engineering - Scandia Digital ABSales visibility we had requested for three years, delivered in fourteen weeks
Three months post-launch our key metrics are all moving in the right direction — user adoption ahead of target, support volume down, time-on-task reduced for our core workflows. The product team has started planning features that were never viable on the previous platform. That is the real proof of the investment: it opened up possibilities rather than just replacing what was there before.
Project summary
Warehouse management errors were accumulating at a rate our clients could see. A proper WMS was the agreed fix — we needed a development partner who had built one before.
Tanya Wolfe
Senior Product Manager - Harbor Point ConsultingThe outcome we needed, on the timeline we needed it, by people we would use again
We received proposals from six vendors. Four of them quoted us prices that bore no relationship to the actual scope. This team came back with something realistic and then delivered against it exactly. I have worked on enough technology projects to know that the gap between what is proposed and what is delivered is where trust gets destroyed. There was no gap here. What was promised is what we got, and the ongoing relationship we have built from this is something we intend to continue.
Project summary
Route optimisation was being handled in spreadsheets. The operational cost of that was measurable and the fix was obvious — but it required engineering investment we had been deferring.