soVision IT
Overall Review Rating
4.2 (5 Ratings)
Overview
soVision IT gives a best mobile app development solution. Their priority is to assure your time is not wasted. They have the certified developers to meet your every requirement. They are passionate about utilizing the newest cutting-edge technologies and possibilities. They always strive to know the process in order to produce effective solutions.
Services
- Web Development
- PHP Development
- AngularJS Development
- CMS Development
- Cloud Governance
- Mobile App Development
- Hybrid App Development
- Cross Platform Development
- iOS App Development
- Ionic App Development
- Content Management System
- Android App Development
Industries Served
soVision IT Reviews
Have a look at these client reviews on previously delivered projects.
Niamh O'Sullivan
Director of Product - Munster Digital LtdPilot to full fleet deployment with zero redesign required along the way
We went with a smaller team than we had originally planned for. I had concerns about whether the capacity would be sufficient given our timeline. Those concerns were unfounded. The team was focused, communication was constant, and the quality at each milestone review was consistent throughout. Smaller does not mean slower when the people are the right ones and this engagement proved that.
Project summary
Our previous vendor had left us with a codebase that worked but was nearly impossible to extend. We needed to fix that without stopping delivery to the business.
Eoghan Fitzgerald
VP of Engineering - Shannon Tech Solutions LtdFive years of siloed records are now a single analytical asset. Worth every dollar.
The platform has been live for six months and is handling three times the transaction volume we scoped for. That is not because we underestimated — it is because the architecture choices made during discovery were genuinely forward-thinking. Most vendors design for exactly what you tell them. This team designed for what you are likely to need. We are already scoping the next phase and there was no question about who we would use.
Project summary
Our internal team was committed to maintenance and could not absorb a new build of this complexity. An external partner was the only way to hit the timeline.
Liselotte Bakker
Head of Platform Engineering - Harbour Digital BVFirst AR project we have shipped where the frame rate held across every device we tested
I have been through several technology implementations in my career. The pattern I am used to is: detailed proposal, optimistic timeline, scope creep, overrun, excuses at the end. This engagement broke that pattern at every stage. The timeline was realistic from the start. Changes were managed through process. The final delivery matched what was agreed. Simple, but uncommon.
Project summary
Our client portal had not been updated since 2018. Prospects were mentioning competitor portals in pitches. We could not keep deferring the investment.
Lucas Almeida
Engineering Manager - Rio Ventures LtdaFirst time our board, CTO, and engineering team agreed on the same technology direction
We received proposals from six vendors. Four of them quoted us prices that bore no relationship to the actual scope. This team came back with something realistic and then delivered against it exactly. I have worked on enough technology projects to know that the gap between what is proposed and what is delivered is where trust gets destroyed. There was no gap here. What was promised is what we got, and the ongoing relationship we have built from this is something we intend to continue.
Project summary
A new practice area required document management workflows that did not exist in our current system. We needed them in place before the first client matter opened.
Aarav Mehta
Chief Data Officer - Zenith FinServ LtdLaunched at 4.7 stars, no critical bugs in the first two weeks. Clean.
Looking back, what strikes me most is how little drama there was. Real technology projects have problems. This one had them too — but every problem was flagged before it became a crisis, every scope change was handled through a proper process, and every risk was managed rather than buried. Our project manager said it was the smoothest vendor engagement he had been involved in. Given how complex the technical requirements were, I think that reflects genuine delivery maturity.
Project summary
The EV transition had created dealer network management requirements our existing DMS was not designed for. A targeted rebuild was the only path forward that timeline would allow.