TEONITE
Overall Review Rating
4.7 (8 Ratings)
Services
- Ethereum Blockchain
- Content Management System
- Mobile App Development
- Cross Platform Development
- iOS App Development
- Platform Development
- Ruby on Rails
- Automotive R&D
- Hyperledger
- ICO consulting Blockchain Implementation
- Android App Development
- Web Development
Industries Served
TEONITE Reviews
Have a look at these client reviews on previously delivered projects.
Adriana Voss
Director of Platform Engineering - Cascadia Digital VenturesA development partner who pushed back when our approach was wrong — exactly what we needed
We have worked with a few agencies over the years and the comparison is honestly not close. What stood out from the start was that they spent serious time understanding the problem before they proposed anything. Once development started, every sprint review was clean — no hidden surprises, no slipped milestones. The production system has been running for four months without a single critical issue. Our internal developers reviewed the codebase at handover and were genuinely complimentary about the quality. That does not happen often.
Project summary
The business case had been approved but the internal resource to execute it had not materialised. External delivery was the pragmatic solution.
Tariq Al-Harbi
Director of Technology - Saudi Cloud HoldingsERP went live on the agreed date. Those of you who have been through ERP projects understand.
We handed them an aggressive deadline, a complex scope, and a client-side team that was stretched and not always available when they needed us. They handled that gracefully. They were precise about what they needed and when they needed it. Where they could proceed independently they did. The delivery landed on time in spite of the constraints we added. I regard that as strong evidence of genuine professional maturity — not just capability.
Project summary
A regulatory deadline required us to modernise how we reported on network performance. The data engineering needed to support it was not something our internal team could absorb without help.
Eoghan Fitzgerald
VP of Engineering - Shannon Tech Solutions LtdFirst time our digital and in-store inventory have ever been in sync
Honestly, I came into this engagement with some scepticism. We had a bad experience with a vendor twelve months earlier and I wanted to see evidence of competence, not just hear about it. The discovery documentation was the first signal. The sprint delivery consistency was the second. By go-live I had stopped being sceptical and started planning how to expand the engagement. The production system has been stable from day one and our internal team loves working with the codebase they left us.
Project summary
Route optimisation was being handled in spreadsheets. The operational cost of that was measurable and the fix was obvious — but it required engineering investment we had been deferring.
Callum Parata
CTO - Kiwi Cloud Solutions LtdDesigned for actual user behaviour, not the persona document we thought was accurate
We received proposals from six vendors. Four of them quoted us prices that bore no relationship to the actual scope. This team came back with something realistic and then delivered against it exactly. I have worked on enough technology projects to know that the gap between what is proposed and what is delivered is where trust gets destroyed. There was no gap here. What was promised is what we got, and the ongoing relationship we have built from this is something we intend to continue.
Project summary
Our internal team was committed to maintenance and could not absorb a new build of this complexity. An external partner was the only way to hit the timeline.
Victoria Haines
Chief Product Officer - Solaris Media GroupTokenisation from whitepaper to mainnet without a single major incident
The knowledge transfer at the end of the project was notably good. Too many vendors see handover as a tick-box exercise. This team ran structured sessions, produced documentation our internal team actually references, and spent real time making sure we understood the architecture decisions well enough to maintain and extend the system independently. Six months later we are doing exactly that without needing to go back to them for every question.
Project summary
Matter administration time had grown to the point where it was showing up in utilisation metrics. Every hour spent on systems was an hour not billed — the business case did not need modelling.