Yellow Leaf Technologies
Overall Review Rating
4.5 (7 Ratings)
Services
- Custom Application Development
- iOS App Development
- PHP Development
- E-commerce Development
- Web Development
- Motion Graphics
- Mobile App Development
- Cross Platform Development
- Mobile App Design
- Android App Development
- AngularJS Development
- Platform Development
Industries Served
Yellow Leaf Technologies Reviews
Have a look at these client reviews on previously delivered projects.
Declan Hartley
Chief Digital Officer - Southern Cross TechnologyWent live on time and under budget. Our CFO framed the project charter.
The part of this project I had been most worried about was the integration work. Our system landscape is complex, some of the upstream APIs were barely documented, and one of our third-party vendors was notoriously slow to respond. This team documented what the upstream vendors could not, built resilience into the architecture where third-party reliability was uncertain, and delivered integrations that have worked exactly as specified since day one. I genuinely could not have asked for more.
Project summary
Our connected vehicle platform was accumulating telemetry data from a growing EV fleet with no clean way to act on it. We needed both the infrastructure and the analytics layer.
Matthieu Renard
Directeur Technique - Lumière Technologies SASDelivered what the proposal described. More rare than it should be.
The part of this project I had been most worried about was the integration work. Our system landscape is complex, some of the upstream APIs were barely documented, and one of our third-party vendors was notoriously slow to respond. This team documented what the upstream vendors could not, built resilience into the architecture where third-party reliability was uncertain, and delivered integrations that have worked exactly as specified since day one. I genuinely could not have asked for more.
Project summary
The project had a board-level visibility date. We needed a partner who would treat the deadline as their own.
Victoria Haines
Chief Product Officer - Solaris Media GroupPositive ROAS in the first full campaign cycle. We did not expect it quite that quickly.
We went with a smaller team than we had originally planned for. I had concerns about whether the capacity would be sufficient given our timeline. Those concerns were unfounded. The team was focused, communication was constant, and the quality at each milestone review was consistent throughout. Smaller does not mean slower when the people are the right ones and this engagement proved that.
Project summary
Our internal team was committed to maintenance and could not absorb a new build of this complexity. An external partner was the only way to hit the timeline.
Preet Sandhu
Senior Engineering Manager - Prairie Tech Solutions IncISO 27001 certification achieved on the first attempt. The preparation was that thorough.
Three months post-launch our key metrics are all moving in the right direction — user adoption ahead of target, support volume down, time-on-task reduced for our core workflows. The product team has started planning features that were never viable on the previous platform. That is the real proof of the investment: it opened up possibilities rather than just replacing what was there before.
Project summary
A regulatory change required us to rearchitect how we stored and processed customer call data. The timeline was set externally, not by our roadmap preferences.
Rohan Desai
Senior Product Manager - Apex Retail Pvt LtdFinally solved the trust problem our procurement team had argued about for two years
We handed them an aggressive deadline, a complex scope, and a client-side team that was stretched and not always available when they needed us. They handled that gracefully. They were precise about what they needed and when they needed it. Where they could proceed independently they did. The delivery landed on time in spite of the constraints we added. I regard that as strong evidence of genuine professional maturity — not just capability.
Project summary
Route optimisation was being handled in spreadsheets. The operational cost of that was measurable and the fix was obvious — but it required engineering investment we had been deferring.