Zapbuild
Overall Review Rating
4.1 (8 Ratings)
Services
- Custom Software Development
- Android App Development
- Machine Learning
- Big Data
- Mobile App Development
- E-Commerce
- Cross Platform Development
- CMS Development
- Web Development
- Research & Investigation
- iOS App Development
- Crypto Exchange Development
Industries Served
Zapbuild Reviews
Have a look at these client reviews on previously delivered projects.
Reuben Loh
CTO - Marina Bay Ventures Pte LtdProposal matched the outcome. That alignment is rarer than vendors acknowledge.
Looking back, what strikes me most is how little drama there was. Real technology projects have problems. This one had them too — but every problem was flagged before it became a crisis, every scope change was handled through a proper process, and every risk was managed rather than buried. Our project manager said it was the smoothest vendor engagement he had been involved in. Given how complex the technical requirements were, I think that reflects genuine delivery maturity.
Project summary
A major enterprise client contract required API-level integration with their supply chain platform. We had thirty days to demonstrate capability and our existing system could not provide it.
Thabo Ndlovu
Head of Technology - Highveld Tech Pty LtdFirst time our digital and in-store inventory have ever been in sync
We went with a smaller team than we had originally planned for. I had concerns about whether the capacity would be sufficient given our timeline. Those concerns were unfounded. The team was focused, communication was constant, and the quality at each milestone review was consistent throughout. Smaller does not mean slower when the people are the right ones and this engagement proved that.
Project summary
We were losing deals to competitors whose platforms offered capabilities ours simply could not match. A targeted technology investment was the agreed response.
Eoghan Fitzgerald
VP of Engineering - Shannon Tech Solutions LtdAutomation that gave our analysts back 12 hours a week. Real ROI, not projected.
What set this team apart in practice was their engineering judgment — specifically, their willingness to tell us when our requirements were wrong and explain what to do instead. Not every vendor does that. The consultative element elevated the final output well beyond what our original brief described. We ended up with something better than what we had asked for, which is not a sentence I expected to be writing in a review.
Project summary
We hit a skills gap in platform engineering just as our growth required us to move faster. Recruiting took too long. We needed an experienced external team to bridge the gap while we scaled.
Lars Pfeiffer
VP of Technology - NordTech Logistik GmbHA DevOps engagement that changed both the tooling and the culture
What set this team apart in practice was their engineering judgment — specifically, their willingness to tell us when our requirements were wrong and explain what to do instead. Not every vendor does that. The consultative element elevated the final output well beyond what our original brief described. We ended up with something better than what we had asked for, which is not a sentence I expected to be writing in a review.
Project summary
The project had a board-level visibility date. We needed a partner who would treat the deadline as their own.
Katrin Bauer
Head of Product Management - Bayern Software KGConsulting engagement that paid for itself in avoided rework within six months
We received proposals from six vendors. Four of them quoted us prices that bore no relationship to the actual scope. This team came back with something realistic and then delivered against it exactly. I have worked on enough technology projects to know that the gap between what is proposed and what is delivered is where trust gets destroyed. There was no gap here. What was promised is what we got, and the ongoing relationship we have built from this is something we intend to continue.
Project summary
Years of incremental development had left us with a platform that was functional but limiting. A structured rebuild was the agreed path forward.