topappdevelopmentcompanies
Write a Review menu
Menu

RabIT software engineering

Overall Review Rating

4.7 (7 Ratings)

Quality 4.6/5
Schedule 4.8/5
Cost 4.4/5
Communication 4.4/5

Services

  • Mobile App Development
  • iOS App Development
  • AngularJS Development
  • MySQL
  • Cross Platform Development
  • Android App Development
  • Private Blockchains
  • Cloud Migration Services
  • Azure Services
  • Web Development
  • Advertising, Media
  • Enterprise App Development

Industries Served

Automotive Gaming & Gambling Logistics & Supply Chain Manufacturing Pharmaceuticals & Biotechnology Sports & Fitness Travel & Hospitality

RabIT software engineering Reviews

Have a look at these client reviews on previously delivered projects.

Takashi Morimoto

Director of IT Strategy - Sakura Digital KK
Posted on May 12, 2025
5.0 Overall Rating

Editorial team adopted it without a single support escalation. That is a first.

We went with a smaller team than we had originally planned for. I had concerns about whether the capacity would be sufficient given our timeline. Those concerns were unfounded. The team was focused, communication was constant, and the quality at each milestone review was consistent throughout. Smaller does not mean slower when the people are the right ones and this engagement proved that.

Project summary

Route optimisation was being handled in spreadsheets. The operational cost of that was measurable and the fix was obvious — but it required engineering investment we had been deferring.

Quality 5.0/5
Schedule 5.0/5
Cost 5.0/5
Communication 4.5/5
project type
Project Type CMS Development
industry
Industry Logistics & Supply Chain
project cost
Project Cost $10,000 to $49,999
Read Full Review

Fiona MacPherson

Operations Director - Highland Analytics Ltd
Posted on Nov 17, 2024
4.5 Overall Rating

First QA engagement where the team found bugs before the client did. Consistently.

Looking back, what strikes me most is how little drama there was. Real technology projects have problems. This one had them too — but every problem was flagged before it became a crisis, every scope change was handled through a proper process, and every risk was managed rather than buried. Our project manager said it was the smoothest vendor engagement he had been involved in. Given how complex the technical requirements were, I think that reflects genuine delivery maturity.

Project summary

Post-pandemic recovery meant reactivating a customer base that had lost the habit. We needed a platform that would make rebooking as frictionless as possible.

Quality 4.5/5
Schedule 4.5/5
Cost 4.0/5
Communication 4.5/5
project type
Project Type Quality Assurance & Testing
industry
Industry Travel & Hospitality
project cost
Project Cost $150,000 to $499,999
Read Full Review

Shreya Krishnaswamy

VP of Product - Luminar Tech Pvt Ltd
Posted on Sep 30, 2024
4.5 Overall Rating

Blind spots in our operational data are gone. The ROI case wrote itself.

The platform has been live for six months and is handling three times the transaction volume we scoped for. That is not because we underestimated — it is because the architecture choices made during discovery were genuinely forward-thinking. Most vendors design for exactly what you tell them. This team designed for what you are likely to need. We are already scoping the next phase and there was no question about who we would use.

Project summary

Our internal team was committed to maintenance and could not absorb a new build of this complexity. An external partner was the only way to hit the timeline.

Quality 5.0/5
Schedule 4.5/5
Cost 4.0/5
Communication 4.0/5
project type
Project Type IoT Development
industry
Industry Sports & Fitness
project cost
Project Cost $50,000 to $149,999
Read Full Review

Nathan Prescott

VP of Technology - Ironclad Insurance Group
Posted on May 29, 2024
4.5 Overall Rating

Smart sensor network that paid back the project cost in under two quarters

The technical quality is the obvious thing to highlight. The automated test suite is comprehensive, the deployment pipeline is solid, and the documentation is actually useful rather than written to satisfy a checklist. But the metric I keep coming back to is what has NOT happened since go-live. No 2am incident calls. No emergency patches. No post-launch retrospectives about what went wrong. For a system of this complexity, that outcome is exactly what we paid for.

Project summary

Clinical trial data management was running on a system that had been extended well past its design intent. Quality risks in that context are not acceptable — we needed a proper rebuild.

Quality 4.0/5
Schedule 4.5/5
Cost 4.5/5
Communication 4.5/5
project type
Project Type IoT Development
industry
Industry Pharmaceuticals & Biotechnology
project cost
Project Cost $150,000 to $499,999
Read Full Review

Cameron Aldrich

Head of Digital Operations - Northstar Logistics Corp
Posted on Jun 01, 2023
5.0 Overall Rating

Proactive monitoring prevented an issue that would have cost us a trading day

Looking back, what strikes me most is how little drama there was. Real technology projects have problems. This one had them too — but every problem was flagged before it became a crisis, every scope change was handled through a proper process, and every risk was managed rather than buried. Our project manager said it was the smoothest vendor engagement he had been involved in. Given how complex the technical requirements were, I think that reflects genuine delivery maturity.

Project summary

A failed engagement the previous year had made us more rigorous about vendor selection. We took the time to find a partner we actually trusted before we committed.

Quality 5.0/5
Schedule 5.0/5
Cost 5.0/5
Communication 4.5/5
project type
Project Type IT Managed Services
industry
Industry Gaming & Gambling
project cost
Project Cost $50,000 to $149,999
Read Full Review
back to top